CFG Bank | Cystic Fibrosis Foundation | 4501 N. Fairfax | Spartan Surfaces

Locations: Baltimore, MD; Bethesda, MD; Arlington, VA; Washington, DC
Clients: New Ground; Mazzuca Contracting; Keane Construction; RZ James
Total SF: 177,069 SQ. FT. (97,000 + 54,400 + 22,105 + 3,564)
Schedules: 3–7 Months (Average: ~4.75 Months)

Workplaces Designed for Productivity.
From high-end corporate offices to specialized non-profit headquarters, we construct spaces that inspire focus and collaboration. Our projects—like CFG Bank, the Cystic Fibrosis Foundation, and Spartan Surfaces—showcase our skill in specialty finishes, bulletproof installations, and architectural detailing.

Scope:

  • Drywall/Gypsum Board Assemblies
  • Acoustical Ceiling Suspension Assemblies
  • Doors, Frames, Hardware
  • Bullet Proof Panels (Baltimore project)
  • Cold-Formed Metal Framing (Washington, DC project)
  • Toilet Accessories Install
  • Specialty Ceilings
  • Rough Carpentry
  • Fire Stopping
  • Smoke Sealants
  • Thermal & Acoustic Insulation