Office

CFG Bank | Cystic Fibrosis Foundation | 4501 N. Fairfax | Spartan Surfaces

Locations: Baltimore, MD; Bethesda, MD; Arlington, VA; Washington, DC
Clients: New Ground; Mazzuca Contracting; Keane Construction; RZ James
Total SF: 177,069 SQ. FT. (97,000 + 54,400 + 22,105 + 3,564)
Schedules: 3–7 Months (Average: ~4.75 Months)

Scope:

  • Drywall/Gypsum Board Assemblies
  • Acoustical Ceiling Suspension Assemblies
  • Doors, Frames, Hardware
  • Bullet Proof Panels (Baltimore project)
  • Cold-Formed Metal Framing (Washington, DC project)
  • Toilet Accessories Install
  • Specialty Ceilings
  • Rough Carpentry
  • Fire Stopping
  • Smoke Sealants
  • Thermal & Acoustic Insulation


Interior Fitout

Riderwood Senior Living

Location: Silver Spring, MD
Client: Donohoe
Schedule: 1 year

Scope:

  • Drywall/Gypsum Board Assemblies
  • Cold-Formed Metal Framing
  • Fiberglass Reinforced Panels (FRP)
  • Acoustical Ceiling Suspension Assemblies
  • Rough Carpentry
  • Fire Stopping
  • Smoke Sealants
  • Thermal & Acoustic Insulation
  • Wall Protection & Corner Guards Install


Multifamily

Brightview Northfax / Mazza Gallerie / Hill House / UMD Leonardtown Apartments / Alta New Carrollton / Nebel St Apartments

Locations: Fairfax, VA | Washington, DC | Bowie | College Park | New Carrollton | Rockville, MD
Clients: Donohoe Construction | Davis/Smoot | Commercial Construction | Wood Partners | Donohoe
Type: Multifamily

Scope:

  • Drywall/Gypsum Board Assemblies
  • Cold-Formed Metal Framing
  • Acoustical Ceiling Suspension Assemblies
  • Doors, Frames, Hardware
  • Sheathing
  • Fiberglass Reinforced Panels (FRP)
  • Specialty Ceilings
  • Rough Carpentry
  • Painting
  • Toilet Accessories Install
  • Fire Stopping
  • Smoke Sealants
  • Thermal & Acoustic Insulation
  • Shaft Walls
  • Air Barriers


Hospitals

Medical Pavilion at White Oak Medical

Center Location: Silver Spring MD
Client: Forester
SF: 169,000 SF
Schedule: 6 Months

Scope:

  •  Drywall/Gypsum Board Assemblies
  •  Acoustical Ceiling Suspension Assemblies
  •  Doors, Frames, Hardware
  •  Lead Shielding Panels
  •  Specialty Ceilings
  •  Rough Carpentry
  •  Fire Stopping
  •  Smoke Sealants
  •  Thermal & Acoustic Insulation


Higher Education

Georgetown McDonough Hall Auditorium | AU Mary Graydon Center

Location: Washington, DC
Client: Irreno Construction
SF: 24,000
Schedule: 6–8 Months

Scope:

  •  Drywall/Gypsum Board Assemblies
  • Drywall/Gypsum Plastering
  • Acoustical Ceiling Suspension Assemblies
  • Doors, Frames, Hardware
  • Toilet Accessories Install
  • Specialty Ceilings
  • Rough Carpentry
  • Fire Stopping
  • Smoke Sealants
  • Thermal & Acoustic Insulation


Government

NOAA

Location: Silver Spring, MD
Client: Wilmar Construction
SF: 12,371
Schedule: 3 Months

Scope:

  • Drywall/Gypsum Board Assemblies
  • Acoustical Ceiling Suspension Assemblies
  • Doors, Frames, Hardware
  • Rough Carpentry
  • Fire Stopping
  • Smoke Sealants
  • Thermal & Acoustic Insulation


Privacy Preference Center